Municipal swimming pool renovation, Bazas, France
New Elevetor was used during the renovation of a municipal swimming pool in Bazas in the South-West of France. During the renovation, the pool's floor is raised from 4.5 m to 2.2 m, allowing for substantial savings of the amount of water.
This project was designed by the Bordeaux architectural agency Blamm and represents an investment of 1,450,000 € for the community. Reopening is expected by mid-July 2017.